The new healthcare facilities, designed by architecture firm Studio Ekberg, will be leased by Region Kalmar County. They are being constructed on the site of the former Norrlidshemmet nursing home.
The two-story building will have a gross area of around 3,500 square meters. It is designed to achieve the Swedish Green Building Council’s new Environmental Building certification version 4.0 Gold level. Calculated using the National Board of Housing’s model, the climate impact of the new building is estimated to be 25% lower than the Gold level threshold.
Project design is currently underway, with construction start planned for February 2025. Completion of the new healthcare facilities is expected in the fourth quarter of 2026, at which point Vacse will take possession of the property.
The translation was written by an AI system, though the original text was authored by a human.
IndustryRadar.com
Business journalism designed for industry innovators.
IndustryRadar operates a single, comprehensive site
that offers summaries and insights from various sectors
across the globe, catering to a wide range of professional interests.
Particularly, IndustryRadar.com provides in-depth coverage
on the construction and infrastructure industry,
highlighting projects, innovations, and key developments.
Editor-in-chief: Myrna Whitaker
Owner: Lundros
Copyright IndustryRadar.com – 2024